| En
Você está aqui: Centro de Mídia > Blog > Piso SPC/WPC/PVC

What is the laying process of LVT flooring?

Visualizações:3 Horário de publicação: 2022-02-01 : Louis Lu

What is the laying process of LVT flooring?

What is the laying process of LVT flooring?

Today, the editor of Boyu introduces to you what is the laying process of LVT flooring? Wuxi Boyu Plastic Machinery Co., Ltd. is the production line of PVC floor extrusion line and the pioneer of SPC floor equipment. The company integrates grille design, production, sales and after-sales service.

ac9c3522a80768fd0a38a567207b91a8.jpg

1. Measure the area of the room

Before installing the floor, it is necessary to accurately measure the paving area of the room in order to be aware of the material loss during the entire paving process.

2. Grassroots treatment

The first step before formally laying the floor is the basic treatment, which is mainly to repair the problem ground and form a new basic layer to avoid the arching of the floor due to the hollow and cracks of the original basic layer. After the base layer is completed, the ground needs to be leveled. If the ground is uneven, not only will there be gaps in the skirting, the overall floor will also be uneven, and there will be abnormal noises, which will seriously affect the quality of the floor.

3. Leveling the ground

The level error of the ground cannot exceed 2mm, if it exceeds, find a way to level it. If the ground is uneven, not only will there be gaps in the skirting, the overall floor will also be uneven, and there will be abnormal noises, which will seriously affect the quality of the floor.